Title: A model case: a machine builder · newworker
Description: A stopped machine costs its owner every hour. A farm machine maker in Konya cut the wait for a part from 52 hours to 9, with 3 AI teams beside its people.
URL: https://newworker.site/cases/machine-builder/
Updated: 2026-11-22

Model case Case 06 · Machine builder

# A stopped machine costs its owner every hour.

Harvests stopped while a machine waited for a part. Now the part ships the same morning.

**Makes**
: Farm machines

**Where**
: Konya, Turkey

**In the field**
: 6,000 machines

**People**
: 420, 60 of them in service

**We placed**
: 3 AI teams, 9 AI workers

9 hours a stopped machine waits, was 52

Each square is one hour.

Model case: a kind of company we build for, with design figures.

## 3 AI teams. 9 AI workers.

-

### Service team

Reads every fault and finds the fix.

AI workers

- Reads fault calls
- Finds past repairs
- Books technicians

Works from

- Fault photos
- 10 years of repairs
- Machine manuals

Works with

- Service lead

-

### Parts team

Finds the part and ships it.

AI workers

- Finds the part
- Checks stock
- Books the courier

Works from

- Parts lists
- Stock in 2 warehouses
- Courier times

Works with

- Parts manager

-

### Build team

Turns every order into a parts list.

AI workers

- Writes parts lists
- Plans the line
- Checks drawings

Works from

- Drawings
- 10 years of repairs
- Line capacity

Works with

- Production manager

## One machine, one day.

1.

Farmer

Farmer → Service team: A photo

2.

Service team, AI team, reads Fault photos, 10 years of repairs

Service team → Service lead: The likely part

3.

Service lead

Service lead → Parts team: Send the belt

4.

Parts team, AI team, reads Stock in 2 warehouses, Courier times

Parts team → Technician: The belt

5.

Technician

Technician → Build team: Repair note

6.

Build team, AI team, reads Drawings, 10 years of repairs

Build team → Production manager: A stronger belt

7.

Production manager

Stopped at 06:10. Running at 15:00.

## What changed.

**Hours a stopped machine waits**
: Before 52 hours
: Now **9 hoursTime to find the right part**
: Before 1 day
: Now **10 minutesTime to fix a part that keeps failing**
: Before 1 year
: Now **1 month**

### People still decide

- **Service lead** which part to send.
- **Technicians** how to repair.
- **Parts manager** what to keep in stock.
- **Production manager** what changes in new machines.

## Back running the same day.

[Talk to us](https://newworker.site/contact/)

Case 01 · Hotel furniture [The fastest quote wins the hotel.](https://newworker.site/cases/furniture-maker/)

Case 02 · Creative agency [A yes on the phone is a week worked for free.](https://newworker.site/cases/creative-agency/)

Case 03 · Trucking [An empty truck costs the same to drive.](https://newworker.site/cases/trucking/)

Case 04 · Property developer [A buyer who waits a day buys somewhere else.](https://newworker.site/cases/property-developer/)

Case 05 · Luxury store [A good client is remembered.](https://newworker.site/cases/luxury-store/)
